Endnotes1. Union of Concerned Scientists. The Nugget File. Cambridge, MA: UCS, 1979. 2. Knapp, Malcolm R. (Director of Radiation Safety and Safeguards, Nuclear Regulatory Commission) to Lawrence Burkhardt, III (Executive Vice President, Nuclear Operations, Niagra Mohawk Power Corporation). "NRC Region I Augmented Inspection Team (AIT) Inspection (50-220/89-90) of the use of the Radwaste Building's sub-basement as a long-term liquid retention facility at Nine Mile Point Unit 1," 2 Oct 1989; Russell, William T. (Regional Administratior, Nuclear Regulatory Commission) to Lawrence Burkhardt, III. "Notice of Violation (NRC Inspection Report No. 50-220/89-90)," 23 Feb 1990; Wald, Matthew L. "Study Says A-Plant's Handling of Waste Left Costly Mess." New York Times 23 Feb 1990. 3. Mississippi Power and Light Company. "Failed Level Recorder Contributes to Operational Error Causing a Reactor Scram" (Licensee Event Report No. 50-416/96-001-00). 30 Jan 1986. 4. May, John. The Greenpeace Book of the Nuclear Age: The Hidden History, the Human Cost. New York: Pantheon Books, 1989. 5. Unsigned. "Flying Nuke Storm Comes Back to Roost." Belfast News Letter 12 March 1998. 6. Nuclear Regulatory Commission. "Indication of Low Water Level in the Oyster Creek Reactor" (Information Notice No. 79-13). 29 May 1979. 7. United Press International. "Fla. Nuclear Reactor's Cooling System Sabotaged by Toilets." Washington Post 19 Aug 1977. 8. Nuclear Regulatory Commission. "Feedwater Line Break" (Information Notice No. 86-106). 16 Dec 1986; Nuclear Regulatory Commission. Information Notice No. 86-106, Supplement 1. 13 Feb 1987; Nuclear Regulatory Commission. Information Notice No. 86-106, Supplement 2. 18 March 1987; Virginia Electric and Power Company. Licensee Event Report No. 50-281/86-020-00. 8 Jan 1987; Virginia Electric and Power Company. Licensee Event Report No. 50-281/86-020-01. 14 Jan 1987; Virginia Electric and Power Company. Licensee Event Report No. 50-281/86-020-02. 31 March 1987; Nuclear Regulatory Commission. Inspection Report No. 50-280/86-42 and 50-281/86-42. 10 Feb 1987. 9. Bertini, H.W. "Descriptions of Selected Accidents That have Occurred at Nuclear Reactor Facilities" (ORNL/NSIC-176). Oak Ridge National Laboratory, Nuclear Safety Information Center. April 1980. 10. Nuclear Regulatory Commission. "Report to Congress on Abnormal Occurrences: October - December 1982." (NUREG-0900, Vol. 5 No. 4.). May 1983. 11. Nuclear Regulatory Commission. "Failure of 76 of 185 Control Rods to Fully Insert During a Scram at a BWR" (Bulletin No. 80-17). 3 July 1980; Buslik, A.J., and R.A. Bari. "System Interaction, with Applications to D.C. Power Systems in Nuclear Reactors." Brookhaven National Laboratory. January 1981. 12. Nuclear Regulatory Commission. "Delayed Access to Safety-Related Areas and Equipment During Plant Emergencies" (Information Notice No. 86-55). 10 July 1986. 13. Radin, Patricia. "Magazine Breaks Pump at Diablo Canyon Plant." Oakland Tribune 6 March 1984. 14. Nuclear Regulatory Commission. "NRC Staff Orders Shutdown of Peach Bottom Nuclear Power Plant" (Press Release No. 87-53). 31 March 1987. 15. Morrison, Don. "NRC Claims Peach Bottom Is Among Nation's Most Safe Plants." The Agegis 25 June 1987. 16. Gruson, Lindsey. "Reactor Closing Shows Industry's People Problem." New York Times. 3 April 1987. 17. Op. cit., Morrison. 18. Nuclear Regulatory Commission. Daily Event Report No. 31736. 6 Feb 1997. 19. INPO Significant Operating Experience Report 94-01. "Nonconservable Decisions and Equipment Performance Problems Result in a Reactor Scram, Two Safety Injections." 14 July 1994. 20. Unsigned. "Salem I, II Operator Find $600,000." Asbury Park Press 18 Oct 1995. 21. Nuclear Regulatory Commission. Daily Event Report No. 34125. 15 July 1998. 22. Nuclear Regulatory Commission. "Inadvertent Defeat of Safety Function Caused by Human Error Involving Wrong Unit, Wrong Train, or Wrong System" (Information Notice No 84-58). 25 July 1984. 23. Nuclear Regulatory Commission. "Integrated Plant Safety Assessment Systematic Evaluation Program: La Crosse Boiling Water Reactor" (NUREG-0827). June 1983. 24. Unsigned. "CP&L Shuts Plant After Its Crew Flunk NRC Test." The Energy Daily 22 May 1990. 25. CER Corporation. "History of 10CFR50, Appendix B, and Its Impact on Nuclear Power Plant Performance." CER Corporation, November 1993. 26. Nuclear Regulatory Commission. "Control Room Evacuation Due to Inadvertent Halogen Actuation" (Preliminary Notification of Event of Unusual Occurrence PNO-I-97-049). 8 Aug 1997; Nuclear Regulatory Commission. "Inadvertent Control Room Halon Actuation Due to a Camera Flash" (Information Notice No. 97-82). 28 Nov 1997. 27. Nuclear Regulatory Commission. "Seal Table Leaks at PWRs" (Information Notice No. 84-55). 6 July 1984. 28. Tennessee Valley Authority. "Sequoyah Nuclear Plant: Investigation of Unit 1 Incore Instrumentation Thimble Tube Ejection Accident on April 19, 1984" (Nuclear Safety Review Staff Investigation Report No. I-84-12-SQN). 1 Aug 1984. 29. Nuclear Regulatory Commission. "Explosive Ordnance Discovered in Owner Controlled Area" (Morning Report No. 3-96-0114). 31 Oct 1996.
Note: David Lochbaum worked as a nuclear engineer in the US nuclear power industry for over seventeen years. He joined the staff of the Union of Concerned Scientists in 1996 as their Nuclear Safety Engineer. His contributions to this book reflect his personal views.
The views expressed above represent the writer and not necessarily those of The Disinformation Company Ltd.
For Further Exploration:
Purchase Everything You Know Is Wrong
Everything You Know Is Wrong Homepage
Table of Contents
A Thumbnail Sketch (Summary)
Quiz
Sample chapter: “Fission Stories: Nuclear Power's Secrets” by David Lochbaum
Sample chapter: “A Canticle for Osama bin Laden” by Alex Burns
Bios of Contributors
Complete Index
Reviews & Interviews
Press Releases
The first book: You Are Being Lied To